All international training tests on IG MARITIME are free for every seafarer. Register once to save your progress and prepare for your next voyage without limits!

EM1-Plan and Schedule Operations

Search this section

Choose a question set and start learning or take an exam.

About this collection

Videotel questions are grouped by professional topic, including machinery, electrical equipment, fuel and ballast operations. Choose a subject relevant to your preparation.

“Видеотел — Engine Category — EM1-Plan and Schedule Operations” contains 12 questions across 1 collection.

Learning

Learning mode has no timer. After answering, you see feedback and the correct options. You can return to a question and repeat a topic.

Exam

A practice exam lasts up to 60 minutes and includes up to 50 questions from the selected collection. Correct answers and results appear after completion.

Sample questions and answers

These examples come from the published collection. Choose Learning to study questions in sequence, or Exam to check your knowledge.

On board your vessel the main engine consumes hourly 1375 litres HFO, the boiler 560 litres per hour and the auxiliary diesel 166 litres per hour. At what throughput shall you feed the HFO purifier?Question illustration

One correct answer

  • 1) 3700 litres/hour
  • 2) 3200 litres/hour
  • 3) 2600 litres/hour
  • 4) 2350 litres/hour✓ Correct answer
What is the most important connection with the deck department for the chief engineer ?The source image is unavailable.

One correct answer

  • 1) Maintenance of all safety appliances.
  • 2) Maintenance of all cargo gear.
  • 3) Knowledge of all sailing plans and cargo loading/discharging.✓ Correct answer
  • 4) The ships speed and consumption.
You are required to order 1 years supply of refrigerant compressor oil and you estimate that consumption will be 480 litres in that time. If there is already an open drum of 180 litres on board, what will you order ?Question illustration

One correct answer

  • 1) One drum x 205 litres + 5 pails x 20 litres.
  • 2) Two drums x 205 litres.
  • 3) 15 pails x 20 litres.
  • 4) 24 pails x 20 litres.✓ Correct answer
According to regulations, on board ships it is necessary to have PUMP REDUNDANCY. What does this mean ?The source image is unavailable.

One correct answer

  • 1) All pumps in the engine room are duplicated
  • 2) All essential pumps in the engine room have a back-up possibility✓ Correct answer
  • 3) Two identical pumps must be fitted for each circuit.
  • 4) A stand-by pump must be available for each pump separately
Which of the following is the Chief Engineer's obligation to calculate in advance for the next voyage and may not be delegated?The source image is unavailable.

One correct answer

  • 1) Fuel requirement.
  • 2) Lub oil requirement.
  • 3) Spares and consumable stores essential for the voyage.
  • 4) All of these.✓ Correct answer

Before you start

Do I need to register to start?

Guest access lasts 23 minutes. Free registration lets you continue without limits, save progress and review mistakes in your account.

What language are the questions in?

Questions and answer options retain the language of the original bank. You can change the interface language separately.

Can I use my result as an official document?

No. This is independent practice. A result does not replace an examination, certificate or knowledge check by an authorised organisation.