Videotel questions are grouped by professional topic, including machinery, electrical equipment, fuel and ballast operations. Choose a subject relevant to your preparation.

“Видеотел — Engine Category > EM5-Manage Fuel and Ballast Operations” contains 4 questions across 1 collection.

Learning

Learning mode has no timer. After answering, you see feedback and the correct options. You can return to a question and repeat a topic.

Exam

A practice exam lasts up to 60 minutes and includes up to 50 questions from the selected collection. Correct answers and results appear after completion.

Sample questions and answers

These examples come from the published collection. Choose Learning to study questions in sequence, or Exam to check your knowledge.

Written information must be available each time bunkering operations are carried out. This should include information about reporting oil spills and provide contact details for which of these organisations?

One correct answer

Question illustration
  • 1) II, III, IV, VI, VIII, IX✓ Correct answer
  • 2) I, II, III, VI, VII, VIII
  • 3) I, III, IV, V, VIII, IX
  • 4) III, IV, V, VI, VII, IX
What will cause the oil/water interface in this centrifugal separator to move outwards from its correct position?

One correct answer

Question illustration
  • 1) An increase in the oil flow rate.
  • 2) A decrease in the viscosity of the oil.
  • 3) An increase in the temperature of the oil.
  • 4) An decrease in the temperature of the oil.✓ Correct answer
Written information must be available each time a ship carries out bunkering operations. This information must include the following....

One correct answer

Question illustration
  • 1) the specific gravity of the oil and the level at which bunker tanks are to be closed.
  • 2) the ventilation and overflow system of each tank and the bunker rate in tons per hour.
  • 3) the procedures for topping off tanks and the bunker slow down rate.
  • 4) the bunkering rates, procedures for topping off tanks and the level at which bunker tanks are to be closed.✓ Correct answer
From the sample diagrams shown, choose the correct voltage waveform measured across the load.

One correct answer

Question illustration
  • 1) 1
  • 2) 2
  • 3) 3✓ Correct answer
  • 4) 4

Before you start

Do I need to register to start?

Guest access lasts 23 minutes. Free registration lets you continue without limits, save progress and review mistakes in your account.

What language are the questions in?

Questions and answer options retain the language of the original bank. You can change the interface language separately.

Can I use my result as an official document?

No. This is independent practice. A result does not replace an examination, certificate or knowledge check by an authorised organisation.