All international training tests on IG MARITIME are free for every seafarer. Register once to save your progress and prepare for your next voyage without limits!

Engine Category > EM1-Plan and Schedule Operations

Search this section

Choose a question set and start learning or take an exam.

About this collection

Videotel questions are grouped by professional topic, including machinery, electrical equipment, fuel and ballast operations. Choose a subject relevant to your preparation.

“Видеотел — Engine Category > EM1-Plan and Schedule Operations” contains 8 questions across 1 collection.

Learning

Learning mode has no timer. After answering, you see feedback and the correct options. You can return to a question and repeat a topic.

Exam

A practice exam lasts up to 60 minutes and includes up to 50 questions from the selected collection. Correct answers and results appear after completion.

Sample questions and answers

These examples come from the published collection. Choose Learning to study questions in sequence, or Exam to check your knowledge.

On board your vessel the main engine consumes hourly 1375 litres HFO, the boiler 560 litres per hour and the auxiliary diesel 166 litres per hour. At what throughput shall you feed the HFO purifier?

One correct answer

Question illustration
  • 1) 3700 litres/hour
  • 2) 3200 litres/hour
  • 3) 2600 litres/hour
  • 4) 2350 litres/hour✓ Correct answer
You are required to order 1 years supply of refrigerant compressor oil and you estimate that consumption will be 480 litres in that time. If there is already an open drum of 180 litres on board, what will you order ?

One correct answer

Question illustration
  • 1) One drum x 205 litres + 5 pails x 20 litres.
  • 2) Two drums x 205 litres.
  • 3) 15 pails x 20 litres.
  • 4) 24 pails x 20 litres.✓ Correct answer
In the starting air layout shown what is the purpose of item 'A'?

One correct answer

Question illustration
  • 1) Pilot air control valve.
  • 2) Automatic air venting valve.
  • 3) Interlock air blocking valve.✓ Correct answer
  • 4) Air relief valve.
What kind of 5-yearly maintenance should be carried out on this type of heat exchanger ?

One correct answer

Question illustration
  • 1) Pull and clean tube nest and inspection by class surveyor.
  • 2) Exchange all gaskets, clean and test for classification.
  • 3) Mechanical and chemical cleaning, test for classification.✓ Correct answer
  • 4) Open inspection covers and check for leaks, clean tubes.
What is the most aspect of communication with the deck department ?

One correct answer

Question illustration
  • 1) Ballasting operations, cargo hold bilge pumping.
  • 2) Executing of orders from the bridge.
  • 3) Executing orders from and issuing warnings to the bridge.✓ Correct answer
  • 4) Operation of fire fighting and life saving equipment.

Before you start

Do I need to register to start?

Guest access lasts 23 minutes. Free registration lets you continue without limits, save progress and review mistakes in your account.

What language are the questions in?

Questions and answer options retain the language of the original bank. You can change the interface language separately.

Can I use my result as an official document?

No. This is independent practice. A result does not replace an examination, certificate or knowledge check by an authorised organisation.