All international training tests on IG MARITIME are free for every seafarer. Register once to save your progress and prepare for your next voyage without limits!

CD7034. TOTS 1B-Familiarisation prior Cargo Operations

Search this section

Choose a question set and start learning or take an exam.

About this collection

The Seagull CBT bank is organised into modules covering safety, shipboard operations, maintenance and other topics. Original module names and codes are retained to help you find the topic you need.

“Seagull CBT — CD7034. TOTS 1B-Familiarisation prior Cargo Operations” contains 12 questions across 1 collection.

Learning

Learning mode has no timer. After answering, you see feedback and the correct options. You can return to a question and repeat a topic.

Exam

A practice exam lasts up to 60 minutes and includes up to 50 questions from the selected collection. Correct answers and results appear after completion.

Sample questions and answers

These examples come from the published collection. Choose Learning to study questions in sequence, or Exam to check your knowledge.

What is the name of the diagram that is superimposed on the cargo control console?

One correct answer

  • The mimic diagram.✓ Correct answer
  • The tank plan.
  • The cargo lines.
  • The pumping plan.
Where would you expect to locate a mimic diagram of the cargo system?

One correct answer

  • In the cargo control room (CCR) operational panel.✓ Correct answer
  • In the Chief Engineer's office.
  • At the manifold.
  • Adjacent to the bunkering manifold.
What is a schematic drawing?

One correct answer

  • A drawing in the form of a diagram and not to scale.✓ Correct answer
  • An exact technical drawing.
  • An approximate drawing.
  • The general arrangement plan.
When is high expansion foam most effective?

One correct answer

  • When rapid filling of an enclosed space is required.✓ Correct answer
  • When the cargo manifold is on fire.
  • When it is to be used as bridge front cooling.
  • Generally anywhere on deck.
During cargo transfer, what action would you take if the Inert Gas System fails?

One correct answer

  • Cease all discharge operations and advise the terminal.✓ Correct answer
  • Increase the rate of discharge.
  • Advise the terminal and continue discharging.
  • Review the Ship / Shore Safety Check List.

Before you start

Do I need to register to start?

Guest access lasts 23 minutes. Free registration lets you continue without limits, save progress and review mistakes in your account.

What language are the questions in?

Questions and answer options retain the language of the original bank. You can change the interface language separately.

Can I use my result as an official document?

No. This is independent practice. A result does not replace an examination, certificate or knowledge check by an authorised organisation.