All international training tests on IG MARITIME are free for every seafarer. Register once to save your progress and prepare for your next voyage without limits!

CD7024. TOTS 1B-Electrical, Electronic and Operations

Search this section

Choose a question set and start learning or take an exam.

About this collection

The Seagull CBT bank is organised into modules covering safety, shipboard operations, maintenance and other topics. Original module names and codes are retained to help you find the topic you need.

“Seagull CBT — CD7024. TOTS 1B-Electrical, Electronic and Operations” contains 56 questions across 1 collection.

Learning

Learning mode has no timer. After answering, you see feedback and the correct options. You can return to a question and repeat a topic.

Exam

A practice exam lasts up to 60 minutes and includes up to 50 questions from the selected collection. Correct answers and results appear after completion.

Sample questions and answers

These examples come from the published collection. Choose Learning to study questions in sequence, or Exam to check your knowledge.

Which of the following would provide the most reliable assessment of the insulation resistance of a motor winding?

One correct answer

  • A megger tester.✓ Correct answer
  • A digital multimeter on resistance setting.
  • An analogue AVO meter on resistance setting.
  • Earth lamps/monitoring unit on the main switchboard.
What element of electrical power is credited with being responsible for damaging the human body.

One correct answer

  • Amps.✓ Correct answer
  • Volts.
  • Frequency.
  • Watts.
What type of protective device would normally be installed at a vessel's main switchboard to serve the incoming cables from a 1.2 MW generator?

One correct answer

  • An Air Circuit Breaker.✓ Correct answer
  • An Isolator.
  • A Miniature Circuit Breaker.
  • FUSES.
The starting of a large induction motor may result in high surge currents that can cause..

One correct answer

  • a voltage dip on the supply.✓ Correct answer
  • an increase in supply frequency.
  • a long run up time.
  • starting of the standby generator.
How often would you expect the operation of standby equipment to be checked? How would you do this?

One correct answer

  • Weekly, by switching over to alternate standby machinery.✓ Correct answer
  • Daily, by switching over to alternate standby machinery.
  • Monthly, by switching over to alternate standby machinery.
  • Quarterly, by switching over to alternate standby machinery.

Before you start

Do I need to register to start?

Guest access lasts 23 minutes. Free registration lets you continue without limits, save progress and review mistakes in your account.

What language are the questions in?

Questions and answer options retain the language of the original bank. You can change the interface language separately.

Can I use my result as an official document?

No. This is independent practice. A result does not replace an examination, certificate or knowledge check by an authorised organisation.