All international training tests on IG MARITIME are free for every seafarer. Register once to save your progress and prepare for your next voyage without limits!

CD7003. TOTS 1A-Mooring Equipment and Operations

Search this section

Choose a question set and start learning or take an exam.

About this collection

The Seagull CBT bank is organised into modules covering safety, shipboard operations, maintenance and other topics. Original module names and codes are retained to help you find the topic you need.

“Seagull CBT — CD7003. TOTS 1A-Mooring Equipment and Operations” contains 58 questions across 1 collection.

Learning

Learning mode has no timer. After answering, you see feedback and the correct options. You can return to a question and repeat a topic.

Exam

A practice exam lasts up to 60 minutes and includes up to 50 questions from the selected collection. Correct answers and results appear after completion.

Sample questions and answers

These examples come from the published collection. Choose Learning to study questions in sequence, or Exam to check your knowledge.

Is it acceptable to travel at the speed of four knots in the approach to the berth?

One correct answer

  • It's too fast.✓ Correct answer
  • It's normal.
  • It's sufficient for manoeuvring.
  • It is up to the Pilot to decide.
What is the recommended procedure if your vessel is equipped with "self-stowing automatic tension" winches and your vessel is moored alongside the loading jetty with fixed loading arms?

One correct answer

  • All mooring ropes should be left secured by the manual mooring brakes and all winches should be left out of gear.✓ Correct answer
  • All winches should be kept in "auto-tension" mode.
  • Head and stern line winches should be kept in "auto-tension" mode and breast and spring ropes should be kept manually secured by brakes.
  • Spring line winches should be kept in "auto-tension" mode and all other ropes should be kept secured by manual brakes.
What is it important to discuss during the pre-berthing briefing between the Master and the ship's officers?

One correct answer

  • The specific berthing operation for the forthcoming berthing, the use of tugs and the position of the mooring ropes/wires to be used.✓ Correct answer
  • Which officer will be on the forecastle and which on the stern during mooring operations.
  • The size (pulling power) of the tugs to be used during berthing.
  • How many crew members should be called for berthing operations.
What is an advantage of split-type mooring drums?

One correct answer

  • All three answers.✓ Correct answer
  • The mooring wires are not "crushed" under load.
  • There is a smaller chance that the mooring rope will be "jammed" on the storage part of reel.
  • The use of the split drum uses the winch braking capacity to its maximum.
When should the emergency towing wires (fire wires) be deployed?

One correct answer

  • When the vessel is berthed at the terminals and tugs are available.✓ Correct answer
  • Only on terminals where the vessel is secured alongside the jetty.
  • Whenever the vessel is not in navigation.
  • Whenever the vessel is anchored or berthed at the terminals.

Before you start

Do I need to register to start?

Guest access lasts 23 minutes. Free registration lets you continue without limits, save progress and review mistakes in your account.

What language are the questions in?

Questions and answer options retain the language of the original bank. You can change the interface language separately.

Can I use my result as an official document?

No. This is independent practice. A result does not replace an examination, certificate or knowledge check by an authorised organisation.