All international training tests on IG MARITIME are free for every seafarer. Register once to save your progress and prepare for your next voyage without limits!

CD0360. Crude oil tankers, Control of flow rates during loading

Search this section

Choose a question set and start learning or take an exam.

About this collection

The Seagull CBT bank is organised into modules covering safety, shipboard operations, maintenance and other topics. Original module names and codes are retained to help you find the topic you need.

“Seagull CBT — CD0360. Crude oil tankers, Control of flow rates during loading” contains 14 questions across 1 collection.

Learning

Learning mode has no timer. After answering, you see feedback and the correct options. You can return to a question and repeat a topic.

Exam

A practice exam lasts up to 60 minutes and includes up to 50 questions from the selected collection. Correct answers and results appear after completion.

Sample questions and answers

These examples come from the published collection. Choose Learning to study questions in sequence, or Exam to check your knowledge.

According to SOLAS, who should control closing and opening of the valves on the inert gas distribution line? Select the ONE correct answer.

One correct answer

  • The officer in charge of the cargo transfer✓ Correct answer
  • The Master, or the appointed deputy if ashore
  • The duty rating when checking for cargo leaks on deck
  • The Chief Engineer or the appointed deputy
During loading, which of the following must be monitored particularly closely while venting through a terminal’s vapour return line? Select the TWO correct answers.

Multiple correct answers

  • Cargo tank vapour pressure✓ Correct answer
  • Cargo loading rate✓ Correct answer
  • Cargo vapour temperature increase
  • Vapour growth in the cargo tank
Which of the following factors are used to determine the size and venting capacity of a cargo oil tank pressure-vacuum valve? Select the TWO best answers.

Multiple correct answers

  • The design loading rate✓ Correct answer
  • Vapour growth during loading✓ Correct answer
  • The height of the pressure-vacuum valve above the deck
  • The horizontal distance between the inert gas inlet and the pressure/vacuum valve
How can the contents of a cargo tank that is not being loaded be checked to see whether or not the ullage is changing during loading? Select the TWO best answers.

Multiple correct answers

  • Set the high and low level alarm close to either side of the ullage of the tank and monitor closely✓ Correct answer
  • Check that any ullage change can be explained by changes in trim, list or temperature✓ Correct answer
  • Check that the loading rate for the tank is always shown as zero on the on-line loading instrument
  • Check to see that the ullage remains constant; any change would indicate tank leakage
During loading, there is a small but continuous change in the ullage of a filled tank not involved in the loading operation. What is the most likely cause? Select the ONE best answer.

One correct answer

  • The hydraulic suction valve for the tank has crept open very slightly✓ Correct answer
  • There has been an increase in cargo temperature
  • There has been a change of trim
  • There has been a change of list

Before you start

Do I need to register to start?

Guest access lasts 23 minutes. Free registration lets you continue without limits, save progress and review mistakes in your account.

What language are the questions in?

Questions and answer options retain the language of the original bank. You can change the interface language separately.

Can I use my result as an official document?

No. This is independent practice. A result does not replace an examination, certificate or knowledge check by an authorised organisation.