All international training tests on IG MARITIME are free for every seafarer. Register once to save your progress and prepare for your next voyage without limits!

CD0344. Loading bulk carriers

Search this section

Choose a question set and start learning or take an exam.

About this collection

The Seagull CBT bank is organised into modules covering safety, shipboard operations, maintenance and other topics. Original module names and codes are retained to help you find the topic you need.

“Seagull CBT — CD0344. Loading bulk carriers” contains 30 questions across 1 collection.

Learning

Learning mode has no timer. After answering, you see feedback and the correct options. You can return to a question and repeat a topic.

Exam

A practice exam lasts up to 60 minutes and includes up to 50 questions from the selected collection. Correct answers and results appear after completion.

Sample questions and answers

These examples come from the published collection. Choose Learning to study questions in sequence, or Exam to check your knowledge.

What might happen if a ship does not request advance information about a terminal where cargo is to be loaded? Select the ONE best answer.

One correct answer

  • There could be a long delay between the time of berthing and commencement of cargo loading operations✓ Correct answer
  • The ship will be placed 'off-hire'
  • The ship could run aground in the approaches to the berth
  • The ship will not be allowed to enter the port
Why is it important for the terminal to supply the Master in advance with the water density at the load berth? Select the ONE best answer.

One correct answer

  • For accurate stability calculations to be made before the loading plan is finalised✓ Correct answer
  • For accurate stability calculations to be made before the commencement of cargo loading operations
  • For calculations to be made during the initial draught survey
  • For calculations to be made during the final draught survey
What is the consequence of the Master of a time-chartered ship issuing Notice of Readiness (NOR) but the ship not being able to receive cargo due to the holds being dirty? Select the ONE correct answer.

One correct answer

  • The ship can be taken off the berth and placed 'off-hire'✓ Correct answer
  • The ship will be deemed unseaworthy
  • The ship will be detained by port-state control
  • The ship can withdraw the NOR
What should the Master do if advised by the shore terminal that cargo with a moisture content in excess of the Transportable Moisture Limit is to be loaded? Select the ONE best answer.

One correct answer

  • The Master would have to demonstrate to the flag-State adequate residual stability in case of cargo shifting and adequate structural integrity for additional stresses✓ Correct answer
  • The Master should never refuse to load if the ship is specially constructed for such cargoes
  • The Master should never refuse to load under any circumstances
  • The Master would have to start loading, but monitor and record the moisture content at regular intervals
What action should be taken by the Master or Chief Officer if deviations from the agreed load plan are detected? Select the ONE best answer.

One correct answer

  • Adjust cargo or ballast operations, or both, to correct the deviations and inform the terminal✓ Correct answer
  • Only ballast operations should be adjusted
  • Contact the shipper and seek clarification
  • Make appropriate entries in the log book

Before you start

Do I need to register to start?

Guest access lasts 23 minutes. Free registration lets you continue without limits, save progress and review mistakes in your account.

What language are the questions in?

Questions and answer options retain the language of the original bank. You can change the interface language separately.

Can I use my result as an official document?

No. This is independent practice. A result does not replace an examination, certificate or knowledge check by an authorised organisation.