CD0275.01. Leadership, Effective resource management, Part 1

Search this section

Choose a question set and start learning or take an exam.

About this collection

The Seagull CBT bank is organised into modules covering safety, shipboard operations, maintenance and other topics. Original module names and codes are retained to help you find the topic you need.

“Seagull CBT — CD0275.01. Leadership, Effective resource management, Part 1” contains 15 questions across 1 collection.

Learning

Learning mode has no timer. After answering, you see feedback and the correct options. You can return to a question and repeat a topic.

Exam

A practice exam lasts up to 60 minutes and includes up to 50 questions from the selected collection. Correct answers and results appear after completion.

Sample questions and answers

These examples come from the published collection. Choose Learning to study questions in sequence, or Exam to check your knowledge.

This type of shipboard resource is depleting and nonrenewable.

One correct answer

  • navigation equipment
  • time✓ Correct answer
  • tools
  • machinery
Which of the following options is NOT considered a shipboard resource?

One correct answer

  • shipboard officers
  • fuel oil
  • pilot boat✓ Correct answer
  • chipping hammer
The vessel is approaching the pilot station. Two crucial tasks should be carried out simultaneously - anchor preparation and rigging the pilot ladder. The Bosun, two OS, the AB and the Second Mate are the only available crew at that time. If you were the Master, to whom would you assign these two tasks?

One correct answer

  • The Bosun and the first OS will prepare the anchor while the AB, the second OS and the Second Mate will rig the pilot ladder.✓ Correct answer
  • The two OS will rig the pilot ladder while the Bosun and the AB will prepare the anchor.
  • The Bosun and the Second Mate will prepare the anchor, while the two OS and the AB will rig the pilot ladder.
  • The Bosun and the Oiler will rig the pilot ladder while the AB and the two OS will prepare the anchor.
In transiting Panama Canal, which of the following measures illustrates the resource levelling method, Split?

One correct answer

  • The vessel will be anchored upon reaching Gatun Lake and only one shipboard personnel will be retained in the fwd and aft stations. The rest of the crew can rest.
  • During mealtimes, it is possible to alternate the bridge duty of the Second Mate and the Third Mate, and the Chief Mate and the Bosun at the fwd station.
  • Panama Canal transit is very crucial that other maintenance jobs should be suspended while the vessel is in transit. Also, it is necessary to delay ballast transfer to adjust the vessel's trim after crossing Panama canal.
  • Securing of deck after transit may be arranged in such a way that the Second Mate and two ratings will be responsible for the aft station, while the Chief Mate and Bosun will be responsible for fwd station.✓ Correct answer
Shipboard resource management process is characterized by four main steps arranged in which order?

One correct answer

  • Definition - Allocation - Consolidation - Levelling✓ Correct answer
  • Definition - Levelling - Allocation - Consolidation
  • Definition - Consolidation - Levelling - Allocation
  • Definition - Allocation - Levelling - Consolidation

Before you start

Do I need to register to start?

Guest access lasts 23 minutes. Free registration lets you continue without limits, save progress and review mistakes in your account.

What language are the questions in?

Questions and answer options retain the language of the original bank. You can change the interface language separately.

Can I use my result as an official document?

No. This is independent practice. A result does not replace an examination, certificate or knowledge check by an authorised organisation.