CD0132. LRM - SHIGI S2

Search this section

Choose a question set and start learning or take an exam.

About this collection

The Seagull CBT bank is organised into modules covering safety, shipboard operations, maintenance and other topics. Original module names and codes are retained to help you find the topic you need.

“Seagull CBT — CD0132. LRM - SHIGI S2” contains 60 questions across 1 collection.

Learning

Learning mode has no timer. After answering, you see feedback and the correct options. You can return to a question and repeat a topic.

Exam

A practice exam lasts up to 60 minutes and includes up to 50 questions from the selected collection. Correct answers and results appear after completion.

Sample questions and answers

These examples come from the published collection. Choose Learning to study questions in sequence, or Exam to check your knowledge.

Where should the lifeboat be located when an operational test on the on-load release mechanism is to be performed?

One correct answer

  • Fully in the water, free of all load on the falls and the hydrostatic interlock system having successfully operated.
  • Partly in the water, such that the mass of the boat is substantially supported by the falls and the hydrostatic interlock system has not operated.✓ Correct answer
  • Between 4 and 5 metres above the level of the water.
  • Fully secured in the davits, with additional retention devices applied.
The emergency release procedure for this mechanism involves:

One correct answer

  • Smashing the glass panel and pulling the control cable.
  • Removing the top cover and lifting the override rod.✓ Correct answer
  • Smashing the glass panel and lifting the interlock indicator.
  • Removing the safety pin and pulling the release lever.
Into which Code were many of the technical items originally found in SOLAS 1974 transferred in 1996?

One correct answer

  • S.T.C.W.
  • MSC/Circ.1093.
  • The Life-Saving Appliances Code.✓ Correct answer
  • MARPOL
Which two factors from the list below are commonly held to be most critical in ensuring the safe and successful release of a lifeboat?

Multiple correct answers

  • The cost of the lifeboat.
  • The working condition of the launching equipment, as determined by the standard of maintenance on that equipment.✓ Correct answer
  • The efficiency of the crew in operating the launching equipment, as established and maintained by the regime of training on board.✓ Correct answer
  • The standard of illustrations and other diagrams relating to the lifeboat release mechanism as displayed in the vessel’s SOLAS Training Manual.
Into which Code were many of the technical items originally found in SOLAS 1974 transferred in 1996?

One correct answer

  • S.T.C.W.
  • The Life-Saving Appliances Code.✓ Correct answer
  • MSC/Circ.1093.
  • MARPOL.

Before you start

Do I need to register to start?

Guest access lasts 23 minutes. Free registration lets you continue without limits, save progress and review mistakes in your account.

What language are the questions in?

Questions and answer options retain the language of the original bank. You can change the interface language separately.

Can I use my result as an official document?

No. This is independent practice. A result does not replace an examination, certificate or knowledge check by an authorised organisation.