All international training tests on IG MARITIME are free for every seafarer. Register once to save your progress and prepare for your next voyage without limits!

CD0130. LRM - IHI GTC

Search this section

Choose a question set and start learning or take an exam.

About this collection

The Seagull CBT bank is organised into modules covering safety, shipboard operations, maintenance and other topics. Original module names and codes are retained to help you find the topic you need.

“Seagull CBT — CD0130. LRM - IHI GTC” contains 61 questions across 1 collection.

Learning

Learning mode has no timer. After answering, you see feedback and the correct options. You can return to a question and repeat a topic.

Exam

A practice exam lasts up to 60 minutes and includes up to 50 questions from the selected collection. Correct answers and results appear after completion.

Sample questions and answers

These examples come from the published collection. Choose Learning to study questions in sequence, or Exam to check your knowledge.

All inspections, other than weekly and monthly and any servicing and repair, other than routine, should be conducted by which of the following persons?

One correct answer

  • The Master.
  • A manufacturer’s representative or a person appropriately trained and certified by the manufacturer for the work to be done.✓ Correct answer
  • A Company Superintendent.
  • A senior officer or a fitter suitable qualified and holding a certificate in lifeboat maintenance.
Which face of the D-shaped cam pin should be in contact with the locking-plate when it is in the closed postion?

One correct answer

  • The flat face.
  • The curved face.✓ Correct answer
How is the D-shaped cam pin turned back into position under the locking plate during resetting?

One correct answer

  • By manually lifting the cam reset lever.✓ Correct answer
  • By the hook pressing against the locking plate.
  • By re-engaging the stopper lever.
  • By pushing the remote release handle back into position.
Which of the following components is spring-loaded?

One correct answer

  • The remote release handle.
  • The after hook.
  • The D-shaped cam pin.
  • The stopper lever.✓ Correct answer
An “on-load release mechanism” is defined as:

One correct answer

  • one that can be released at any time from any height.
  • one designed to be operated when the boat is hanging in the falls at an approximate height of 2-3 metres above the water.
  • one designed to be operated when the boat has been lowered and is waterborne, whether or not a load is being applied to it by the action of the ship or the sea.✓ Correct answer
  • one designed to be operated when the load applied to them is removed – that is, when the boat has been lowered and is waterborne.

Before you start

Do I need to register to start?

Guest access lasts 23 minutes. Free registration lets you continue without limits, save progress and review mistakes in your account.

What language are the questions in?

Questions and answer options retain the language of the original bank. You can change the interface language separately.

Can I use my result as an official document?

No. This is independent practice. A result does not replace an examination, certificate or knowledge check by an authorised organisation.