All international training tests on IG MARITIME are free for every seafarer. Register once to save your progress and prepare for your next voyage without limits!

CD0031. Pusnes ETS

Search this section

Choose a question set and start learning or take an exam.

About this collection

The Seagull CBT bank is organised into modules covering safety, shipboard operations, maintenance and other topics. Original module names and codes are retained to help you find the topic you need.

“Seagull CBT — CD0031. Pusnes ETS” contains 23 questions across 1 collection.

Learning

Learning mode has no timer. After answering, you see feedback and the correct options. You can return to a question and repeat a topic.

Exam

A practice exam lasts up to 60 minutes and includes up to 50 questions from the selected collection. Correct answers and results appear after completion.

Sample questions and answers

These examples come from the published collection. Choose Learning to study questions in sequence, or Exam to check your knowledge.

Packing of pick-up gear container procedure: How do you check that the light bulbs is flashing?

One correct answer

  • Turn the boys with the bulbs pointing down for a few seconds and up again.
  • Turn the light bulb off then on again for a few seconds.
  • Move the buoys up then down rapidly again a few times.
  • Hold the buoys in an upright position for a few seconds.✓ Correct answer
What is the correct thing to do when the light bulbs are not flashing when holding the buoys in an upright position?

One correct answer

  • Replace the batteries and/or the electronic unit with bulb.✓ Correct answer
  • Replace the batteries and/or the lamp.
  • First replace the bulb then replace the batteries.
  • Replace the entire top unit.
How often is it necessary to mount the air motor and unreel the entire length of the towing wire and check for any damage?

One correct answer

  • In the 6th months Maintenance
  • In the 12th months Maintenance
  • In the 2-year Maintenance✓ Correct answer
  • In the daily Maintenance
How often shall the weak link and the turnbuckle be checked?

One correct answer

  • In the 6th months Maintenance✓ Correct answer
  • In the 12th months Maintenance
  • In the 2-year Maintenance
  • In the daily Maintenance
What is the maximum allowed deployment time for the forward ets system?

One correct answer

  • 15 minutes
  • 30 minutes
  • 1.5 hours
  • 1 hour✓ Correct answer

Before you start

Do I need to register to start?

Guest access lasts 23 minutes. Free registration lets you continue without limits, save progress and review mistakes in your account.

What language are the questions in?

Questions and answer options retain the language of the original bank. You can change the interface language separately.

Can I use my result as an official document?

No. This is independent practice. A result does not replace an examination, certificate or knowledge check by an authorised organisation.