All international training tests on IG MARITIME are free for every seafarer. Register once to save your progress and prepare for your next voyage without limits!

EN-MIEA / SMM, OM1 / 1

Search this section

Choose a question set and start learning or take an exam.

About this collection

The ANR bank contains many sets with original names and codes, including navigation, safety and equipment topics. Select a module by name or use question search.

“ANR — EN-MIEA / SMM, OM1 / 1” contains 157 questions across 1 collection.

Learning

Learning mode has no timer. After answering, you see feedback and the correct options. You can return to a question and repeat a topic.

Exam

A practice exam lasts up to 60 minutes and includes up to 50 questions from the selected collection. Correct answers and results appear after completion.

Sample questions and answers

These examples come from the published collection. Choose Learning to study questions in sequence, or Exam to check your knowledge.

The sub-multiple prefix 'micro' (Greek letter 'mu') means

One correct answer

  • thousandth (10 to the -3rd power)
  • millionth (10 to the -6th power)✓ Correct answer
  • billionth (10 to the -9th power)
  • trillionth (10 to the -12th power)
If fuse #1 shown in the illustration EL-0062 is defective, a voltage tester connected across points "C" and "B" willQuestion illustration

One correct answer

  • show a reading of 55 volts
  • show full line voltage across fuse #2
  • give positive indication that fuse #2 is good
  • show a reading of zero volts✓ Correct answer
Any electric motor can be constructed to be

One correct answer

  • short proof
  • ground proof
  • explosion proof✓ Correct answer
  • overload proof
Which of the spaces listed is defined as a 'location requiring an exceptional degree of protection' when considering the installation of shipboard electrical equipment?

One correct answer

  • Machinery space✓ Correct answer
  • Chart room
  • Console room
  • Accommodation space
Which of the listed sections of an emergency switchboard is used to supply power for alarm signals under emergency conditions?

One correct answer

  • The generator and bus transfer section
  • The 450 volt, 60 cycle, 3 phase bus
  • The 120 volt, 3 phase, 60 cycle bus
  • The 24 volt DC bus✓ Correct answer

Before you start

Do I need to register to start?

Guest access lasts 23 minutes. Free registration lets you continue without limits, save progress and review mistakes in your account.

What language are the questions in?

Questions and answer options retain the language of the original bank. You can change the interface language separately.

Can I use my result as an official document?

No. This is independent practice. A result does not replace an examination, certificate or knowledge check by an authorised organisation.